Indoor service
Bathroom Fitting & Tiling in Cambridgeshire
Full bathroom rip-outs and refits — plumbing, tiling, electrics and finishes, all done properly. Across March and the wider Cambridgeshire area.
What we do
Bathroom fits — finished without the leaks.
Most bathroom problems show up two years after the install — leaks behind the tile, grout giving way, silicone going mouldy. We do the unseen waterproofing properly, so the finished room actually holds up.
Full strip-out, first-fix plumbing and electrics, walls tanked, tiles laid level, suite installed, signed off and tested. We work clean — the rest of the house stays liveable while we're in.
On the tools
What's included in a bathroom fit
Strip-out & first fix
Old suite out, plumbing and electrics first-fixed properly — done before any tile or plaster goes near the room.
Tiling, walls & floors
Walls tanked properly before tiling. Tiles laid level, grout lines tight. Floor tiles set in a proper waterproof base.
Suite install & sign-off
WC, basin, bath, shower — installed by us, tested, sealed properly so nothing leaks behind the wall in two years.
Common questions
Bathroom FAQs
How long does a full bathroom take?
Do you source the suite and tiles?
Can we still use the rest of the house?
Do you guarantee the work?
Where we work
Bathroom Fitting & Tiling in Cambridgeshire across Cambridgeshire.
Based in March, working across all of these towns and villages. Your area not listed? Just ask — we travel for the right project.
- March
- Chatteris
- Doddington
- Wimblington
- Manea
- Benwick
- Whittlesey
- Ramsey
Time for the bathroom done right?
Free site visit, honest pricing, finished on time. Doug will be in touch the same day.